A Framework to Mitigate the Risk of Delay in an Aerospace Supply Chain

Iman ZIAEI, Mohsen Sadegh AMALNICK
2.271 568

Abstract


Abstract. Delay is a significant type of aerospace supply chain risk. The article tries explaining its aspects to reach a final strategy with regards to benchmarking through several related solutions of the risk mitigation. The strategy considers both lean and agile products of commercial airplane manufacturing. 


Keywords


Supply chain risk, Aerospace industry, Risk of delay

Full Text:

PDF


References


You, F., & Grossmann, I. (2008). Design of Responsive Process Supply Chains under Demand Uncertainty . Computers and Chemical Engineering , 32 (12), 3090-3111. [2] Varma, R. (2013). Airbus – A380. Retrieved October 12, 2014, from http://calleam.com/WTPF/?p=4700

Wallace, J. (2012). Aerospace Notebook: Lightning a Weighty Issue for The 787. Retrieved September 8, 2014, from http://www.seattlepi.com/business/277220 air12.html

Wang, W., Heng, M., & Chau, P. (2007). Supply Chain Management: Issues in the New Era of Collaboration and Competition. London: Idea Group Ink (IGI).

Wolfe, H., & NewMyer, D. (1985). Aviation Industry Regulation. New York: Southern Illinois University Press.

Xu, S. (2011). Mitigate Risks Related to Just-in-Time Inventory. Retrieved September 22, 2014, from inventory/

Blecker, T., Kersten, W., & Ringle, C. (2013). Pioneering Solutions in Supply Chain Performance Management: Concepts, Technologies and Applications. Koln: Josef EUL Verlag.

Aiello, J. (2008). Rightsizing Inventory. Danvers: Taylor & Francis Group.

Cheng, T., & Podolsky, S. (1996). Just-in-Time Manufacturing: An Introduction (2 ed.). London: Chapman & Hall.

Chopra, S., & Sodhi, M. (2004). Managing Risk to Avoid Supply Chain Brakedown. MIT Sloan Management Review , 46 (1), 53-61.

Christopher, M. (2011). Logistics and Supply Chain Management (4 ed.). New Jersey: Pearson.

Daily Telegraph, T. (2013). Boeing 787 Dreamliner: A Timeline of Problems. Retrieved October 9, 2014, timeline-of-problems.html

Fuller, G. (2002). Purchasing Contracts: A Practical Guide. London: Spiramus Press.

Ferrari, B. (2008). Boeing and Airbus Product Delays- Lessons in Supply. The Ferrari Research and Consulting Group, Massachusetts.

Fouche, G. (2014, May 10). Norwegian Air Expecting Delay on Boeing 787s to be a Few Weeks- Report. http://www.reuters.com/article/2014/03/10/us-norwegianair-boeing-idUSBREA290AR20140310

Great Britain Parliament, H. (2007). Recent developments with Airbus. Great Britain Parliament: House of Commons: Trade and Industry Committee. London: The Stationary Office Limited of.

Hallgren, M., & Olhager, J. (2009). Lean and Agile Manufacturing: External and Internal Drivers and Performance Outcomes. International Journal of Operations and Production Management , 29 (10), 976-999.

Kaps, R., Hamilton, J., & Bliss, T. (2012). Labor Relations in the Aviation and Aerospace Industries. New York: Southern Illinois University Press.

Kober, J., & Heinecke, G. (2013). The Importance of Managing Events in a Build-to-Order Supply Chain: A Case Study at a Manufacturer of Argicultural Machine. In H. Kreowski, B. Scholz-Reite, & K. Thoben (Eds.), Dynamics in Logistics: Third International Conference, LDIC 2012 Bremen, Germany, February/March 2012 Proceedings (pp. 175-186). Berlin: Springer Science & Business Media.

Jutner, U. (2005). Supply Chain Risk Management: Understanding the Business Requirement from a Practitioner Perspective. The International Journal of Logistics Management , 16, 120-141.

Joseph, Z., & Asher, B. (2008). Development Program Risk Assessment Based on Utility Theory. Risk Management , 10, 285-299.

Lai, K., & Cheng, T. (2009). Just-in-Time Logistics. Burlington: Gower Publishing.

Lambert, D. (2008). Supply Chain Management: Processes, Partnerships, Performance (3 ed.). Sarasota, Florida: Supply Chain Management Institute.

Mason-Jones, R., Naylor, B., & Towill, D. (2000). Engineering the Leagile Supply Chain. International Journal of Agile Management Systems , 2 (1), 54-61.

Michaels, D. (2012). Hit by Delays, Airbus Tries New Way of Building Planes. Retrieved October 12, 2014, from http://online.wsj.com/articles/SB10001424052702303879604577407861198472788

Nash, M., Poling, S., & Ward, S. (2006). Using Lean for Faster Six Sigma Results: A Synchronised Approach. New York: Productivity Press.

Ohno, T. (1982). How The Toyota Production System Was Created? 10 (4), 83-101.

Pearson, D. (2012). Supply Chain is Main Risk for Airbus A350 Program. Retrieved October 13, 2014, from http://www.marketwatch.com/story/supply-chain-is-main-risk-for-airbus-a350-program- 2012-01-17

Porter, M. (1998). Competitive Advantage: Creating and Sustaining Superior Performance. New York: The Free Press.

Rothman, A. (2011). Airbus Delays First A350 Plane Deliveries by as Much as Six Months to 2014 . Retrieved October 12, 2014, from http://www.bloomberg.com/news/2011-11-10/airbus-delays-a350- plane-books-270m-charge.html

Sanders, P., Michaels, D., & Cole, A. (2009). Boeing Delays New Jet Again. Retrieved October 12, 2014, from The Wall Street Journal: http://online.wsj.com/articles/SB124576258516441545

Sheffi, Y. (2005). The Resilient Enterprise. Massachusetts: MIT Press.

Slack, N., Chambers, S., & Johnston, R. (2007). Operations Management (5 ed.). Essex: Pearson.

Sodhi, M. S., & Tang, C. S. (2012). Managing Supply Chain Risk. Ney York: Springer.

Stundza, T. (2007). Composites Bring Boeing’s Buyers, Engineers and Parts Suppliers Closer. Purchasing Magazine Online , March (1).

Trent, R. (2008). End-to-end Lean Management: A Guide to Complete Supply Chain Improvement. Florida: J. Ross Publishing.